
Levi delivered an engineered floor system on a Friday afternoon for a new house start. He got to the job and called me because I did not have PT Plates or daylight wall on that load. I did have that scheduled for the following Monday when the framer was starting, I just wanted to get the floor systems on the job ahead of time. I appreciate Levi calling me because I could have missed that. Means a lot to have the drivers looking out for us!